petescort 15 ft 20 ft 30 ft 50 ft Long Lead-Training Leash/Long Line Dog Leash Great for Dog/Puppy Training,Play,Camping,Extra Long Dog Leash
Availability: Pre-Order, Inquiry Price
About this product
*Select the ship method
Description
PETESCORT as a pet trainer favorite brand, We focus on training leash design and production,and committed to providing high quality products worldwide such as long lead for dog training, our mission is to let all dog owners enjoy training with their dogs and every second with them!
This training lead leash is great for teaching your dog recalls. It has the length needed to allow them to wander and ensure your command to come is obeyed! Teach your dog recalls and other obedience skills, for off leash dog training, and more!This is a great long dog lead for dog training!
RECOMMENDED USE
1.long dog lead 15 and 20 ft:Great for exploratory walking,potty with shorter range.
2.long dog leash 30 feet:Close ball play,using the potty with freedom.
3.long dog leash 50 feet:Recall training,freedom to romp,off_leash simulation
LONG LEASH WIDTH:3/4 inch wide
PACKAGE CONTENT
1×long leash for dog trainingÂ























